Customization: | Available |
---|---|
After-sales Service: | Installation |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. construction material hoist/lift/elevator with rack and pinion could be design according to different building situation |
2. With ISO9001, CE, SGS, BV, SASO certifications |
3. Double or Single cage with loading capacity from 500kg to 3000kg |
4. With Frequency Inverter or DOL control system with low speed, MID speed, and high speed |
5. All Production Line adopt special fixture, mould, gauge made by us to ensure all detaile size |
6. Select high quality raw material from China Bao Steel Group, other like motors, reducers, gearbox, safety device with low noise, electrics is schneider or Korea repute brand with reliable quality |
7. Special design, compact and reasonable structure, easy to installation and adjustment |
8. Each equipment should be test and make record in Factory, all details will be adjust like Motor brake, safety device operation, all limit switch operation, dropping test, loading test, and mast section erection test to ensure the completed equipment run well when taken into use |
Characteristic | Model | Rated Loading | Lifting Speed | Motor Power |
Double cages | SC200/200 | 2x2000kg | 33m/min | 2x(3x11kw) / 2x(3x8.5kw) |
SC150/150 | 2x1500kg | 33m/min | 2x(2x13kw) | |
SC100/100 | 2x1000kg | 33m/min | 2x(2x11kw) | |
Single cage | SC200 | 2000kg | 33m/min | 3x11kw /3x8.5kw |
SC150 | 1500kg | 33m/min | 2x13kw | |
SC100 | 1000kg | 33m/min | 2x11kw |
Characteristics | Model | Rated Loading | Lifting Speed | Motor Power | |
Double cages | Low speed | SC200/200D | 2X2000kg | 0-40m/min | 2x(3x11kw) /2x(3x8.5kw) |
SC100/100D | 2x1000kg | 0-40m/min | 2x(2x13kw) | ||
Mid speed | SC200/200Z | 2x2000kg | 0-60m/min | 2x(2x23kw) | |
SC100/100Z | 2x1000kg | 0-60m/min | 2x(2x15kw) | ||
Single cage | Low speed | SC200D | 2000kg | 0-40m/min | 3x11kw /3x8.5kw |
SC100D | 1000kg | 0-40m/min | 2x13kw | ||
Mid speed | SC200Z | 2000kg | 0-60m/min | 2x23kw | |
SC100Z | 1000kg | 0-60m/min | 2x15kw |
A.Producing process:
Strict material selection- blanking- inspection - welding-inspection- Blasting - inspection -Baking finished or galvanized- inspection -Finished product
1. Equipping with Anti-falling governor | 5. Overload protector |
2. Electrical an Mechanical interlock: Door safety switches, Slack rope switch | 6. Bottom Buffer |
3. Safety hook | 7. Level Calling system and auto leveling device to be choose |
4. Upper and bottom limit switches, trap door limit switch | 8. Ramp door for (Ex.door of cage) |
Shandong Xingdou Intelligent Co., Ltd is a professionalmanufacturer and exporter for construction material hoist/lift/elevator with rack and pinion
1. 17 years more manufacturing experience and 10 Years exporting experiences | 4. Best price offered with special discount, high quality you can enjoy |
2. Great technician Team with innovation and improvement alibilties | 5. Fast response with sales and after-sale service |
3. Zero accident record and good feedback from enduser | 6. Welcome agent or distributor all over the world for cooperation partnership |