1.Construction hoist of common models: |
|
Characteristic |
Model |
Rated Loading |
Lifting Speed |
Motor Power |
|
|
SC200/200 |
2×2000kg |
33m/min |
2×(3×11kw) |
|
Double cabin |
SC150/150 |
2×1500kg |
33m/min |
2×(2×15kw) |
|
|
SC100/100 |
2×1000kg |
33m/min |
2×(2×11kw) |
|
|
SC200 |
2000kg |
33m/min |
3×11kw |
|
Single cabin |
SC150 |
1500kg |
33m/min |
2×15kw |
|
|
SC100 |
1000kg |
33m/min |
2×11kw |
|
|
|
|
|
|
|
2. Construction hoist with Interver: |
|
|
|
|
|
|
Characteristics |
Model |
Rated Loading |
Lifting Speed |
Motor Power |
|
|
SC200/200D |
2×2000kg |
0-33m/min |
2×(3×11kw) |
|
Low-speed |
SC100/100D |
2×1000kg |
0-33m/min |
2×(2×11kw) |
Double Cabin |
|
SC200/200Z |
2×2000kg |
0-55m/min |
2×(2×11kw) |
|
Mid-speed |
SC100/100Z |
2×1000kg |
0-55m/min |
2×(2×11kw) |
|
|
SC200D |
2000kg |
0-33m/min |
3×11kw |
Single |
Low-speed |
SC100D |
1000kg |
0-33m/min |
2×11kw |
Cabin |
|
SC200Z |
2000kg |
0-55m/min |
2×11kw |
|
Mid-speed |
SC100Z |
1000kg |
0-55m/min |
2×11kw |
|
Specifications
SC200/200 Construction Elevator
1. Double cages
2. Construction hoist for material and workers
3. Max Lifting Height: 150m
Protective Measures of construction hoist:
1. A Master switch on the operation board: When the button turned off, unexpected action to other buttons can not let cage working.
2. Anti-falling safety device (with Centrifugal breaking system ): When all other protection device losing action, it can protect the cage from falling.
3. Mechanical inter-locking door: When the cage running it can close by itself from protecting people from dropping.
4. Overload alarm device.
5. Upper and lower travel limit: They can limit the cage go over the top mast.
6. The top mast section have no rack in order to protect the cage from overrunning or dropping.
7. Manual button: You can operate the botton to let the cage go down when interruption of power supply.
8. Emergency switch: When the cage losing control or over-runing, you can press in this button.