Customization: | Available |
---|---|
After-sales Service: | Oversea Service |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Long service life Building Hoist Elevator with Safety Device Construction hoist lift
Construction lift Technical data(OEM): CE approved.
Product Type | Model | Lifting Speed(m/min) | Max Height(m) | Drive Unit | Safety Device | Electronic Control Systerm |
Direct driving PLC | SC100/100 | 33 m/min | 150m | 2*11KW | SAJ30-1.2 | PLC |
SC150/150 | 33 m/min | 150m | 2*15KW | SAJ40-1.2 | PLC | |
SC200/200 | 33 m/min | 150m | 3*11KW | SAJ40-1.2 | PLC | |
Low Speed VFD | SC100/100L | 0-40 m/min | 250m | 2*11KW | SAJ40-1.2 | 30KW VFD |
SC150/150L | 0-40 m/min | 250m | 2*13KW | SAJ40-1.2 | 30KW VFD | |
SC200/200LA | 0-33 m/min | 250m | 2*13KW | SAJ40-1.2 | 30KW VFD | |
SC200/200LB | 0-40 m/min | 250m | 2*15KW | SAJ40-1.2 | 37KW VFD | |
SC200/200LC | 0-46 m/min | 250m | 3*11KW | SAJ40-1.2 | 37KW VFD | |
Mid Speed VFD | SC200/200MA | 0-55 m/min | 350m | 2*19KW | SAJ40-1.4 | 45KW VFD |
SC200/200MB | 0-60 m/min | 350m | 2*23KW | SAJ40-1.4 | 55KW VFD | |
SC200/200MC | 0-63 m/min | 350m | 3*15KW | SAJ50-1.4 | 55KW VFD | |
SC200/200MD | 0-72 m/min | 350m | 3*19KW | SAJ50-1.6 | 75KW VFD | |
High Speed VFD | SC200/200HA | 0-80 m/min | 450m | 3*23KW | SAJ50-1.6 | 75KW VFD |
SC200/200HB | 0-90 m/min | 450m | 3*26KW | SAJ50-2.0 | 90KW VFD | |
SC200/200HC | 0-100 m/min | 450m | 3*32KW | SAJ50-2.0 | 110KW VFD | |
SC200/200HD | 0-120 m/min | 550m | 3*19KW | SAJ50-2.4 | 75KW VFD |
Construction lift Main Parts Details
Manufacturing Technology
A. Construction elevastor Production process:Strict material selection- blanking- inspection - welding-inspection- Blasting - inspection -Baking finished or galvanized- inspection -Finished product
Main CONSTRUCTION Lift Parts: Cage/Cabin
1. bottom and roof of Cage adopt trapezoidal frame
2. Bottom and the roof are full symmetry
3. The plane of symmetry are connected by Bending plate, Bending channel and square pipe which make it firm, straight and balance in use.
4. The wall around cage can be fixed by Punched Aluminium plate, Punched zinc plate, steel wire mesh.
5. Surface Treatment: Blasting, Baking finished,Galvanized
Main CONSTRUCTION LIFT Part: Mast Section
1. Steel plates are bented of U-shape to strengthen the mast section. |
2. Mast section with galvanized coat or heat spray coat can be chosen. |
3. High quality steel plate Q345B bended by special machine: Thickness 4.5mm. |
4. Welded steel tube Q345B and seamless steel tube 20# are also available: Ø76*4.5mm or Ø89*4.5mm (Thickness of 6mm or 8mm is also available). |
5. 650*650*1508mm is the most common size fits for clients. Other model of mast section can choose: 450*450*1508mm, 650*900*1508mm,800*800*1508mm |
About us
We have has 26 overseas offices, the country has nearly 50 sales outlets, establish a sound system of the service network.
Main Project and Market FOR Construction personnel and materials hoist lift
Aftersale service oversea
1.Quality Assurance:
Good quality is assured by advanced manufacturing technology.and all products will be checked by our quality-control manager.
|
2.Excellent Package:
We provide standard,strong,protective package for our products to prevent is from outer damage.
|
3.Quickly Response:
Detailed information,specific model and price of price of products will be provided quickly after receiving your inquiry.
|